Tabs

Saturday, September 12, 2009

Michigan Football: Notre Dame at Michigan -- MAIZE OUT

Notre Dame (1-0) at Michigan (1-0)
MAIZE OUT
Michigan leads the series 20-15-1
September 12, 2009
3:30pm EDT. - 7:00pm EDT.
DirecTV Channel: local ABC
ABC
at Michigan Stadium


The stadium project will include preservation of the existing structure and enhancements that will improve the game-day experience for all Michigan fans. Planning has been under way for more than three years. Construction is scheduled to begin at the end of the 2007 football season and to be completed by August 2010.

Improvements include:

• Wider seats and aisles with handrails to make it easier for fans to move in the aisles.
• New elevated concourses with additional restrooms and concessions along both sidelines.
• More wheelchair locations along the sidelines.
• Two new buildings on the north end of the stadium that will house additional restrooms, concessions and public safety services.
• A new building on the south end of the stadium that will offer additional concessions and restrooms.
• A new press box.
• Refurbished restroom facilities.
• 650+ new chairback seats on the west side.
• 46 suites in the west side structure (33 suites located on the first level and 13 suites on the second level).
• 1,900+ outdoor club seats and stadium lounge on the first level of the east side structure.
• 250+ indoor club seats and 850+ covered outdoor club seats and stadium lounge on the second level of the east side structure.
• 36 suites on the third level of the east side structure.
• Four towers, one at the end of each sideline structure, which will have elevators and wide stairways to bring patrons to the new concourses and premium seating areas.

Thanks for stopping by Go Blue Michigan Wolverine
If you have any questions please E-Mail

Written by ErocWolverine


No comments:

Post a Comment